Progress Report:
1. Weeds pulled
2. Stepping stones arranged
3. Flowers planted (but I think the slugs may have eaten them)
The bathtub restoration kit requires 24C temperatures for applying the epoxy paint. So obviously that's on hold for a couple of weeks since it can't get it up over 20. That should give me time to find Cheryl's respirator to wear while doing the tub job; safety first!
Does anyone else see the disconnect with this packaging? Bit of a mixed message maybe?
I think THEY need to update!
1. Weeds pulled
2. Stepping stones arranged
3. Flowers planted (but I think the slugs may have eaten them)
The bathtub restoration kit requires 24C temperatures for applying the epoxy paint. So obviously that's on hold for a couple of weeks since it can't get it up over 20. That should give me time to find Cheryl's respirator to wear while doing the tub job; safety first!
Does anyone else see the disconnect with this packaging? Bit of a mixed message maybe?
I think THEY need to update!